01753 534826 | enquiries@adamson.co.uk

Single Storey Office Roof Works

Case Study: 17980

Value
£2,710

Location
Maintenance Area, Wexham, Park Hospital, Slough

Contract Length
4 days

Types of Work Involved:

Roof works / Insulations / UPVC Facia and Soffit

The Task:

To re-furbish a dated felted roof system over a single storey office.

The Problem:

Water ingress into the building. This was due to thermal movement in the existing felt causing cracks. The felted system had de-bonded from the back of the fascia trim, leaving an open crack for water to penetrate. Flashing details were poor giving access to further water penetration.

The Solution:

Firstly edge protection was erected providing a safe working area. The stones were then removed from the roof surface which was cleaned and the existing felt was prepared with bridging membrane.

The existing facia and soffit was removed and rigid 100mm Celotex insulation boarding inserted and the existing soffit and facia boarding replaced with UPVC.

Two coats of Sikalastic were then applied with Sika reinforcement-mat dressed into it and back rolled.

Fibreglass reinforced liquid applied roofing membranes give a superior roof surface as the membrane is a seamless coating. Felted systems are jointed every metre and this will be prone to leaks later in life. The Sikalastic life can be easily increased by re-coating to Manufacturers specification before its 10 year limit.

Latest Work

Take a look at some of our most recent work.

Ascot Single Storey Extension

Residential

Bishopsgate School Extension

Education

Office Extension in Warehouse Area

Construction

Thorpe Park, Bar 360 Refurbishment Works

Leisure

Replacement of Resin Floor in Production Area

Food Manufacturing

Re-siting gas tank storage bases and compound

Pharmaceutical

New Car Parking Area

Manufacturing

Amenities Refurbishment in Factory

Food Manufacturing

Toilet Floor Refurbishment

Education

Replacement of Existing Factory Floor

Food Manufacturing

Factory Epoxy Resin Floor

Food Manufacturing

Sikalastic Roof Cladding Repair

Aviation

Sikalastic Low Level Roof Refurb

Health

Sika Trocal Roof Membrane Install

Retail

Belzona Roof Waterproofing

Estates

Single Ply Flat Roof

Food Manufacturing

Sikalastic Roof Refurbishment

Health

Belzona Leaded Roof Refurbishment

Estates

Belzona Flat Roof, Gutter and Porch Refurb

Estates

Single Storey Office Roof Works

Health

Factory Machine Base Refurbishment

Food Manufacturing

Suspended Ceiling Repair

Health

Disabled Access Wet Room

Health

Portable Cabin Wet Room

Health

HBN Compliant Shower Rooms

Health

Town Hall Refurbishment

Government

Tottenham Hotspur Advertising Boards

Leisure

Tiling of Room and Stairs

Utilities

Telecommunications Installation

Data Centre & IT

School Maintenance and Refurbishment

Education

School Classroom and Toilets Renovation

Education

School Classroom and Entrance Renovation

Education

Roof Decking Refurbishment

Estates

Retaining Wall Install

Residential

Residential House Renovation

Residential

Residential Hard Landscaping

Residential

Residential Flood Damage Refurbishment

Residential

Newport Church Refurbishment

Heritage

Manchester United Advertising Boards

Leisure

Male & Female Toilets & Family Room Refurbishment

Retail

Lorry Park Resurfacing Works

Logistics

Locker Room and Welfare Facilities Install

Utilities

GB Rowing Team Cabin

Leisure

Gas Storage Compound

Pharmaceutical

Factory Extension

Food Manufacturing

Cricket Club House Refurb

Leisure

Concrete Block Wall

Utilities

Coating of Concrete Bund Walls

Construction

Cladding to Rear Shed

Construction

Battersea Church Refurbishment

Heritage

Wet Room Conversion

Health

Kitchen & Dining Room Floor Remedial

Residential

Get in touch

If you are interested in receiving further information or would like a quote please fill in the following form:

[salesforce form=”1″]

The Benefits of Using Adamson Construction

We have 25 years of success within the construction industry

We have a clear focus on loyalty, trust and aftercare - our customers appreciate our honesty

One point of contact

We pride ourselves on customer care and go the extra mile

Act as an integrated part of your team – not just your contractor

Not only do we fulfil your immediate requirements, but we oversee and manage your nominated suppliers where necessary

We look at both the short term goals and long term value of all projects

Deliver swift response times with regular communication

Specialists in several industries where our experience and knowledge of these mean we are adaptable to various disciplines, fulfilling our customers’ needs

Understand your unique needs, challenges and goals

Provide a fresh thinking, proactive and enthusiastic approach – helping you save time and money

Accreditations: Achilles, Constructionline, Safecontractor, CHAS, ISO 9001, Investors in People, CORC, FeRFA, FMB

Accreditations

Adamson Construction are proud to be accredited with the following:

TESTIMONIALS

I have dealt with Adamson Construction since 2005, during which time they have provided construction services to the business that I work for. They have demonstrated excellent support in the areas of project management, site safety (CDM) and have provided professional and knowledgeable personnel. Their work has been a factor in ensuring that our projects are completed to budget and schedule.

I can confidently recommend Adamson Construction as a solid and reliable supplier, and experts in their field.

Capital Projects Manager - Pharmaceutical manufacturer, Slough.

Social Media

FOLLOW US ON...