Portable Cabin Wet Room

Case Study: 17833

Value
£21,000

Location
Ward 18, Wexham Park Hospital

Contract Length
14 days

Types of Work Involved:

Carpentry / Joinery / Demolition / Plumbing / Flooring / Electrical / Suspended ceilings

The Task:

The Trust identified the former store room as the ideal site for the Install of HBN, (Health Building Note) HTM (Health Technical Memorandum) compliant wet room.

The Problem:

The ward remained live throughout the duration of the works making the control of noise, vibration and dust of highest importance. There were no services present within the room and the building was of a timber/ Portable cabin type construction, resulting in floor joists being re-configured to accommodate the Shower tray and waste runs. The room had a double door fitted as it was for storage, which needed to be reconfigured to be used for disabled access.

The Solution:

Firstly, designs were compiled and agreed upon with the Trust’s IPC (Infection Prevention Control) team, the ward matron (end-users) and the client.

On commencement of the project, a screen was erected as a change area and buffer zone between site and patient areas and tack mats were installed as an added control measure.

The doors were removed and a new door, frame and partition wall was installed to configure the opening for a single disabled access door.

The room was decanted of all shelving, vinyl sheet flooring and ceiling tiles which were all disposed of. The Plywood floor was lifted and set aside and walkways were put in place to create safe working areas.

Floor joists were removed and a new configuration was installed to accommodate the shower tray and waste runs. The shower tray was then installed and the waste run through new penetrations in the existing joists to the adjacent WC’s waste stack. The WC was taken out of action for 2 hours only and the connections were made and tested. New insulation was installed throughout the floor void as none was present, before the ply flooring was installed.

A flexible levelling compound was applied to the plywood floor and Altro safety flooring was then installed throughout with 100mm cap and cove up-stand. Trovex clean room cladding was then installed around the shower tray.

Trovex Hygipod IPS (Integrated Plumbing System) panels were then installed in locations for clinical wash basin, shower and disabled WC. All service connections were made and tested.

The walls were then decorated with 2no coats of Dulux Sterisheild eggshell paint. New Armstrong Hydroboard wet room suitable ceiling tiles were installed into the existing grid.

New wet room suitable lighting was installed with 1no emergency fitting. Extraction was installed, vented to the outside and tested.

Anti-ligature shower curtain was installed. All edges were sealed with silicon.

A builders clean was performed and then IPC, end-user and client inspections were carried out before the contract was signed off as complete. The screen was removed after the hospital performed a deep clean.

Latest Work

Take a look at some of our most recent work.

Twickenham Single Storey Extension

Residential

Ascot Single Storey Extension

Residential

Bishopsgate School Extension

Education

Office Extension in Warehouse Area

Construction

Thorpe Park, Bar 360 Refurbishment Works

Leisure

Replacement of Resin Floor in Production Area

Food Manufacturing

Re-siting gas tank storage bases and compound

Pharmaceutical

New Car Parking Area

Manufacturing

Amenities Refurbishment in Factory

Food Manufacturing

Toilet Floor Refurbishment

Education

Replacement of Existing Factory Floor

Food Manufacturing

Factory Epoxy Resin Floor

Food Manufacturing

Sikalastic Roof Cladding Repair

Aviation

Sikalastic Low Level Roof Refurb

Health

Sika Trocal Roof Membrane Install

Retail

Belzona Roof Waterproofing

Estates

Single Ply Flat Roof

Food Manufacturing

Sikalastic Roof Refurbishment

Health

Belzona Leaded Roof Refurbishment

Estates

Belzona Flat Roof, Gutter and Porch Refurb

Estates

Single Storey Office Roof Works

Health

Factory Machine Base Refurbishment

Food Manufacturing

Suspended Ceiling Repair

Health

Disabled Access Wet Room

Health

Portable Cabin Wet Room

Health

HBN Compliant Shower Rooms

Health

Town Hall Refurbishment

Government

Tottenham Hotspur Advertising Boards

Leisure

Tiling of Room and Stairs

Utilities

Telecommunications Installation

Data Centre & IT

School Maintenance and Refurbishment

Education

School Classroom and Toilets Renovation

Education

School Classroom and Entrance Renovation

Education

Roof Decking Refurbishment

Estates

Retaining Wall Install

Residential

Residential House Renovation

Residential

Residential Hard Landscaping

Residential

Residential Flood Damage Refurbishment

Residential

Newport Church Refurbishment

Heritage

Manchester United Advertising Boards

Leisure

Male & Female Toilets & Family Room Refurbishment

Retail

Lorry Park Resurfacing Works

Logistics

Locker Room and Welfare Facilities Install

Utilities

GB Rowing Team Cabin

Leisure

Gas Storage Compound

Pharmaceutical

Factory Extension

Food Manufacturing

Cricket Club House Refurb

Leisure

Concrete Block Wall

Utilities

Coating of Concrete Bund Walls

Construction

Cladding to Rear Shed

Construction

Battersea Church Refurbishment

Heritage

Wet Room Conversion

Health

Kitchen & Dining Room Floor Remedial

Residential

The Benefits of Using Adamson Construction

We have 25 years of success within the construction industry

We have a clear focus on loyalty, trust and aftercare – our customers appreciate our honesty

One point of contact

We pride ourselves on customer care and go the extra mile

Act as an integrated part of your team – not just your contractor

Not only do we fulfil your immediate requirements but we oversee and manage your nominated suppliers where necessary

We look at both the short term goals and long term value of all projects

Deliver swift response times with regular communication

Specialists in several industries where our experience and knowledge of these mean we are adaptable to various disciplines, fulfilling our customers needs

Understand your unique needs, challenges and goals

Provide a fresh thinking, proactive and enthusiastic approach – helping you save time and money

Accreditations: Achilles, Constructionline, Safecontractor, CHAS, ISO 9001, Investors in People, CORC, FeRFA, FMB

Accreditations

Adamson Construction are proud to be accredited with the following:

TESTIMONIALS

I have dealt with Adamson Construction since 2005, during which time they have provided construction services to the business that I work for. They have demonstrated excellent support in the areas of project management, site safety (CDM) and have provided professional and knowledgeable personnel. Their work has been a factor in ensuring that our projects are completed to budget and schedule.

I can confidently recommend Adamson Construction as a solid and reliable supplier, and experts in their field.

Capital Projects Manager - Pharmaceutical manufacturer, Slough.

Social Media

FOLLOW US ON...