01753 534826 | enquiries@adamson.co.uk

Office Extension in Warehouse Area

Case Study: 19013

Value
£189,000

Location
Slough

Contract Length
16 weeks

Types of Work Involved:

Steel Fabricators / First fix Carpentry / Dry lining Contractors / Second fix Carpentry / Decorations /Electrical works / Air conditioning / Plumbing / Smoke detection systems / Security systems / Contract floor laying

The Task:

To erect an office extension in the existing warehouse at the back of existing office areas. We were required to install 2 floors into a restricted head height area.

The Problem:

Due to requirements to keep the amenities open, the area could not be completely sealed off and the factory was in operation 24/7.

The potential noise of the preparation works would mean some of these works would have to be executed out of normal working hours.

The works resulted in an inevitable reduction in locker usage which had to be dealt with.

The Solution:

The first aspect of the works was the Structural steel fabrication which was carried out off site to minimise hot works and other associated hazards. The erection was then carried out in a safe manner. Once in place the first fix carpentry works, joisting and floorboards as well as erection of metal studwork, first fix for Electrics and Air conditioning. To ensure adequate sound proofing in the offices, dry lining with 2 layers of 15mm special fire rated boards on outer face with 2 layers of 15mm sound block boarding was mounted on Resilient bars. This was all taped and jointed prior to decoration. Installation of FD 60 1 hour fire rated doors to the external wall. All internal doors were FD30 half an hour fire rating and were varnished. The walls were all Decorated with 3 coats of Dulux emulsion. The first floor had suspended ceiling installed and all lighting and emergency lighting was recessed LED lighting. All Electricity fed through desk height Dado rail with a few floor sockets set in the floor and CAT 6 cables were fed to each socket. Air conditioning units fitted to every room. Carpets fitted throughout and safety nosings to all stairs. The job was finished to the clients expectations and further works are in the pipeline with this client.

Latest Work

Take a look at some of our most recent work.

Ascot Single Storey Extension

Residential

Bishopsgate School Extension

Education

Office Extension in Warehouse Area

Construction

Thorpe Park, Bar 360 Refurbishment Works

Leisure

Replacement of Resin Floor in Production Area

Food Manufacturing

Re-siting gas tank storage bases and compound

Pharmaceutical

New Car Parking Area

Manufacturing

Amenities Refurbishment in Factory

Food Manufacturing

Toilet Floor Refurbishment

Education

Replacement of Existing Factory Floor

Food Manufacturing

Factory Epoxy Resin Floor

Food Manufacturing

Sikalastic Roof Cladding Repair

Aviation

Sikalastic Low Level Roof Refurb

Health

Sika Trocal Roof Membrane Install

Retail

Belzona Roof Waterproofing

Estates

Single Ply Flat Roof

Food Manufacturing

Sikalastic Roof Refurbishment

Health

Belzona Leaded Roof Refurbishment

Estates

Belzona Flat Roof, Gutter and Porch Refurb

Estates

Single Storey Office Roof Works

Health

Factory Machine Base Refurbishment

Food Manufacturing

Suspended Ceiling Repair

Health

Disabled Access Wet Room

Health

Portable Cabin Wet Room

Health

HBN Compliant Shower Rooms

Health

Town Hall Refurbishment

Government

Tottenham Hotspur Advertising Boards

Leisure

Tiling of Room and Stairs

Utilities

Telecommunications Installation

Data Centre & IT

School Maintenance and Refurbishment

Education

School Classroom and Toilets Renovation

Education

School Classroom and Entrance Renovation

Education

Roof Decking Refurbishment

Estates

Retaining Wall Install

Residential

Residential House Renovation

Residential

Residential Hard Landscaping

Residential

Residential Flood Damage Refurbishment

Residential

Newport Church Refurbishment

Heritage

Manchester United Advertising Boards

Leisure

Male & Female Toilets & Family Room Refurbishment

Retail

Lorry Park Resurfacing Works

Logistics

Locker Room and Welfare Facilities Install

Utilities

GB Rowing Team Cabin

Leisure

Gas Storage Compound

Pharmaceutical

Factory Extension

Food Manufacturing

Cricket Club House Refurb

Leisure

Concrete Block Wall

Utilities

Coating of Concrete Bund Walls

Construction

Cladding to Rear Shed

Construction

Battersea Church Refurbishment

Heritage

Wet Room Conversion

Health

Kitchen & Dining Room Floor Remedial

Residential

Get in touch

If you are interested in receiving further information or would like a quote please fill in the following form:

[salesforce form=”1″]

The Benefits of Using Adamson Construction

We have 25 years of success within the construction industry

We have a clear focus on loyalty, trust and aftercare - our customers appreciate our honesty

One point of contact

We pride ourselves on customer care and go the extra mile

Act as an integrated part of your team – not just your contractor

Not only do we fulfil your immediate requirements, but we oversee and manage your nominated suppliers where necessary

We look at both the short term goals and long term value of all projects

Deliver swift response times with regular communication

Specialists in several industries where our experience and knowledge of these mean we are adaptable to various disciplines, fulfilling our customers’ needs

Understand your unique needs, challenges and goals

Provide a fresh thinking, proactive and enthusiastic approach – helping you save time and money

Accreditations: Achilles, Constructionline, Safecontractor, CHAS, ISO 9001, Investors in People, CORC, FeRFA, FMB

Accreditations

Adamson Construction are proud to be accredited with the following:

TESTIMONIALS

I have dealt with Adamson Construction since 2005, during which time they have provided construction services to the business that I work for. They have demonstrated excellent support in the areas of project management, site safety (CDM) and have provided professional and knowledgeable personnel. Their work has been a factor in ensuring that our projects are completed to budget and schedule.

I can confidently recommend Adamson Construction as a solid and reliable supplier, and experts in their field.

Capital Projects Manager - Pharmaceutical manufacturer, Slough.

Social Media

FOLLOW US ON...