Male & Female Toilets & Family Room Refurbishment

Case Study: 18290

Value
£80,000

Location
Observatory Shopping Centre, Slough

Contract Length
Observatory Shopping Centre, Slough

Types of Work Involved:

Demolition / plumbing / electrical / carpentry / tiling / suspended ceilings / cubicle installations / lighting / sanitary installations / air conditioning / sprinkler system and smoke modifications / CCTV modifications / decoration / steam cleaning / Toilet sundries install

The Task:

CDM notifiable project requiring a detailed health and safety folder to enable the client to compose an O&M (Operation and Maintenance) Manual. Refurbishment of shopping centre WC’s and family room. Installation of all new sanitary ware including new cubicles, vanity units, hand dryers and mirrors.

The Problem:

Observatory shopping centre was still in use and the only temporary facility for public WC’s were in the centre management’s staff toilets. Because of this we were actioned to do the female side first incorporating the family room as well. The public were directed using signage to the staff toilets. We were programmed to carry the first phase of the works in 3 weeks. This required meticulous planning of trades and materials to meet this time line. Immediately after the female toilets and family room were signed off, we were to start on the male side.

The Solution:

Firstly signage was erected and the public entrances and working areas were screened off from the public to prevent ingress of dust to the shopping centre and to make the area safe and secure. All services were isolated. All WC’s were left in place and covered as these were to be overhauled. All other sanitary ware, cubicles, vanity units and hand dryers were decanted and disposed of. The existing ceiling lighting and ventilation grills were disconnected.

Lighting was disposed of and grills set aside for refurbishment and temporary lighting was installed throughout site. The suspended ceiling was then dismantled and disposed of and all wall tile grout was removed back to adhesive.

A new Armstrong clip-in ceiling was installed with perforated tiles. New venting ducts were installed in the ceiling grid along with LED lighting and an LED strip light into the bulk head above the vanity units.

New sinks with sensor taps and urinals were installed. All WC’s were refurbished and some replaced where required. New anti-vandal toilet seats were installed. DOC M packs were installed into the disabled WC’s. Bench mounted soap dispensers were installed into the vanity units.New HPL (High Pressured Laminate) cubicles were installed to all areas.

New point of use water heaters were installed into both the male and female service ducts.Fuse spurs were installed for all sensor taps, water heaters and Ecoblade hand-dryers. Hand dryers were then installed.

All wall tiles were re-grouted and polished off then decoration and repair to all door frames and family room walls. All door hardware was replaced or refurbished. This included locks, door-closers and hinges. New mirrors were installed to all vanity units.

The sprinkler system, smoke detectors, security cameras and speakers were re-configured to fit new ceiling grid layout. All floor tiles were steam cleaned and new floor grills fitted to drainage.

WC’s were re-opened once client was happy with the works. Once work was completed we compiled our Health and safety file and forwarded it to our client’s CDM Principal Designer.

Latest Work

Take a look at some of our most recent work.

Ascot Single Story Extension

Residential

Bishopsgate School Extension

Education

Office Extension in Warehouse Area

Construction

Thorpe Park, Bar 360 Refurbishment Works

Leisure

Replacement of Resin Floor in Production Area

Food Manufacturing

Re-siting gas tank storage bases and compound

Pharmaceutical

New Car Parking Area

Manufacturing

Amenities Refurbishment in Factory

Food Manufacturing

Toilet Floor Refurbishment

Education

Replacement of Existing Factory Floor

Food Manufacturing

Factory Epoxy Resin Floor

Food Manufacturing

Sikalastic Roof Cladding Repair

Aviation

Sikalastic Low Level Roof Refurb

Health

Sika Trocal Roof Membrane Install

Retail

Belzona Roof Waterproofing

Estates

Single Ply Flat Roof

Food Manufacturing

Sikalastic Roof Refurbishment

Health

Belzona Leaded Roof Refurbishment

Estates

Belzona Flat Roof, Gutter and Porch Refurb

Estates

Single Storey Office Roof Works

Health

Factory Machine Base Refurbishment

Food Manufacturing

Suspended Ceiling Repair

Health

Disabled Access Wet Room

Health

Porta Cabin Wet Room

Health

HBN Compliant Shower Rooms

Health

Town Hall Refurbishment

Government

Tottenham Hotspur Advertising Boards

Leisure

Tiling of Room and Stairs

Utilities

Telecommunications Installation

Data Centre & IT

School Maintenance and Refurbishment

Education

School Classroom and Toilets Renovation

Education

School Classroom and Entrance Renovation

Education

Roof Decking Refurbishment

Estates

Retaining Wall Install

Residential

Residential House Renovation

Residential

Residential Hard Landscaping

Residential

Residential Flood Damage Refurbishment

Residential

Newport Church Refurbishment

Heritage

Manchester United Advertising Boards

Leisure

Male & Female Toilets & Family Room Refurbishment

Retail

Lorry Park Resurfacing Works

Logistics

Locker Room and Welfare Facilities Install

Utilities

GB Rowing Team Cabin

Leisure

Gas Storage Compound

Pharmaceutical

Factory Extension

Food Manufacturing

Cricket Club House Refurb

Leisure

Concrete Block Wall

Utilities

Coating of Concrete Bund Walls

Construction

Cladding to Rear Shed

Construction

Battersea Church Refurbishment

Heritage

Wet Room Conversion

Health

Kitchen & Dining Room Floor Remedial

Residential

Get in touch

If you are interested in receiving further information or would like a quote please fill in the following form:

[salesforce form=”1″]

The Benefits of Using Adamson Construction

We have 25 years of success within the construction industry

We have a clear focus on loyalty, trust and aftercare - our customers appreciate our honesty

One point of contact

We pride ourselves on customer care and go the extra mile

Act as an integrated part of your team – not just your contractor

Not only do we fulfil your immediate requirements, but we oversee and manage your nominated suppliers where necessary

We look at both the short term goals and long term value of all projects

Deliver swift response times with regular communication

Specialists in several industries where our experience and knowledge of these mean we are adaptable to various disciplines, fulfilling our customers’ needs

Understand your unique needs, challenges and goals

Provide a fresh thinking, proactive and enthusiastic approach – helping you save time and money

Accreditations: Achilles, Constructionline, Safecontractor, CHAS, ISO 9001, Investors in People, CORC, FeRFA, FMB

Accreditations

Adamson Construction are proud to be accredited with the following:

TESTIMONIALS

I have dealt with Adamson Construction since 2005, during which time they have provided construction services to the business that I work for. They have demonstrated excellent support in the areas of project management, site safety (CDM) and have provided professional and knowledgeable personnel. Their work has been a factor in ensuring that our projects are completed to budget and schedule.

I can confidently recommend Adamson Construction as a solid and reliable supplier, and experts in their field.

Capital Projects Manager - Pharmaceutical manufacturer, Slough.

Social Media

FOLLOW US ON...